Site suitability ensures that the solar power plant is optimally located. Placing the plant in unsuitable site and will cause solar PV production efficiency to drop or malfunction.
Learners need to know what constitutes site suitability, how to assess sites, how to conduct energy assessment and how they should optimise solar PV designs.
In this way, they can help to resolve space optimisation problem, derive optimum cost function value, and mitigate technical constraints related to the suitability of the sites for the plants.
This course will equip learners with the knowledge and skills to administer energy assessments and site analysis procedures so that learners can recommend suitable sites and optimisation methods for usable space.
Participants will also be required to complete a self-directed e-learning.
21
21
1. Features of Solar Photovoltaic (PV)
2. Site Analysis Process
3. Energy Assessments
A Statement of Attainment by SSG will be downloadable at MySkillsfuture Portal after fulfilling all attendance, assignment and assessment requirements
SCEM: 21 PDU Points
GMAP: TBA
PE PDU: 6
(SSG Training Grant Approved Course, available for Singaporean and PR)
* Terms & conditions apply
* View https://seastraining.org.sg/funding-schemes/ for more details on the funding schemes
Course Fee Payable | ||
---|---|---|
Original Fee | Before GST | With GST (9%) |
Course Fee | $1,000.00 | $1,090.00 |
Individual Pricing (Fee payable to Training Provider) | Before GST | With GST (9%) |
Self-Sponsored: WSQ Funding | $500.00 | $590.00 |
Self-Sponsored: WSQ Mid-Career Enhanced Subsidy | $300.00 | $390.00 |
Corporate Pricing (Fee payable to Training Provider) | ||
SME | Before GST | With GST (9%) |
Company Sponsored: WSQ Enhanced Training Support for SMEs | $300.00 | $390.00 |
Non-SME | Before GST | With GST (9%) |
Company-Sponsored: Non SME Companies | $500.00 | $590.00 |
Company-Sponsored: Non SME Companies for SC >40 Years Old | $300.00 | $390.00 |